Process of installation:
Step 1. Use the CAN cable to connect inverter and lithium battery . Step 2. Replace the battery BMS protocol to “LUXPOEWR” by BMS tool and host
computer.(Please refer to page 4,point 4.2)
Step 3. Turn on the switch of battery , power output ready . Step 4. Turn on the inverter (Warning: Turn on the battery first and then the inverter)
Step 5. To connect battery BMS, need to set the battery types as “Li-ion” in Program 03. After
set“Li-ion”in Program 03, then choose battery brand to “2 Pylon Batte